Pinc Group deliver BIM for FMG Projects
Pinc Group Deliver BIM Solution + 14 key Applications for FMG
Pinc Group delivered the Building Information Modelling (BIM) solution for Fortescue Metals Group to allow their future operations to manage both the construction and commissioning and the maintenance and reliability requirements supported by the use of 3D models and associated technology. A total of 14 applications were delivered for the Eliwana and Ironbridge (IBJV) projects (and were to be rolled out for future FMG Projects). Applications including ProjectWise, iConnect, Track’em and PIMS were rolled out and/or updated in line with current and future requirements.
Tagged under:
IT Applications